Short stops stay off the shift report. Here is the math for one line, and the PLC running bit you need so the hours include them.
Nick Nenno·Founder, Setpoint
Most plants only report the long breakdowns. The line also stops for a jam cleared in ninety seconds, a film break, a short interlock, or a restart. Those minutes stay off the shift report. Over a year they cost more than they look, once you include margin, labor, and the scrap from each restart.
You cannot get that number from a checkbox filled in after the shift. You need the running bit and the enabled bit from the PLC, with a timestamp each time they change. Here is the calculation for one line.
Model
Count more than the hours the line was down
A worksheet for one line
Rate
120
good units / hour
Margin
$4.50
per good unit
Lost hours
6.2
last week, including short stops
Weekly hit
$3,348
120 x $4.50 x 6.2
Which PLC bits the number depends on
Use machine state from the PLC, not a box someone checks after the line is already running again. At minimum, log line running and line enabled. If the program already has fault bits or reason codes, log those too, so you know why it stopped.
If a two-minute jam never gets a timestamp, the downtime report is missing the stops the line actually had.
Once those tags are logged with timestamps on the edge device, you can separate a planned stop from an unplanned one, compare shifts, and check whether a change gave those minutes back.
Log the running bit on one line
A Setpoint Pilot includes an edge device configured so uptime history comes from your PLCs.
Setpoint
From the running bit to uptime
Setpoint logs the tags that say the line is running or enabled, keeps writing if the network drops, and shows that history in uptime insights without an export. Use alarms and tag history when you need the fault from that same window, along with the hours. Start with a Pilot, or read how logging works without a historian.
The longer method is in the guide on quantifying downtime and heater energy from PLC signals.