KPIs · Downtime
Stopped time from the enabled bit, including the jams the shift report skips.
Downtime is every minute the line was not moving
Downtime is time the enabled bit is off during the window you asked about. A ninety-second jam counts, along with the long breakdown.
Downtime is the time the line was not moving during the window you asked about. Not moving means the enabled bit is off. A ninety-second jam is downtime. A two-hour breakdown is downtime too.
If the shift report only lists the long breakdown, it is missing the short stops. Those minutes are still time the line was not moving. Over a week they can add up to more lost time than the one stop everyone remembers.
Formula
Time the enabled bit was off
Window
8 h
The shift you asked about
Stopped
1.5 h
Enabled bit off
Short stops
22
Each one has a start and an end
Of the shift
19%
1.5 / 8
If a two-minute jam never gets a timestamp, the downtime number is missing stops the line actually had.
What you can split once the stops have timestamps
All of that stopped time lowers utilization. It is also the time OEE availability loses. A planned changeover and a fault are both time the enabled bit is off. To keep the changeover out of mean time between failures, log a fault bit or a reason code so the planned stop is not counted as a failure.
Uptime insights sums this stopped time from the enabled bit for the line, the shift, or the day. The method is the same one in the true cost of unplanned downtime and the guide on downtime from PLC signals. On a packaging line, the short stops are the ones that move the day, which is covered on the packaging page.
Count the short stops on one shift
We will log the enabled bit and show every stop, including the ones shorter than a minute.
See downtime on one line
Book a demo or start a Pilot. Bring the enabled bit from one line, including the short stops.