KPIs
The numbers the morning meeting already uses.
Each page is one KPI. It says what the number counts, which PLC bits it needs, and which part of the shift it leaves out.
OEE
OEE from availability, performance, and quality
Three factors multiplied. A guess in any one of them makes the OEE number a guess.
Read the KPIUtilization
Utilization is the share of the shift the line was moving
The share of the shift the line was moving, including scrap time.
Read the KPIProductivity
Productivity is good product while the line was moving
Good product while the line was moving. Units per hour needs a counter.
Read the KPIDowntime
Downtime is every minute the line was not moving
Stopped time from the enabled bit, including the jams the shift report skips.
Read the KPIMean time between failures
Mean time between failures is running time per unplanned stop
Average moving time between unplanned stops. Planned changeovers stay out.
Read the KPI
See one of these numbers on your line
Book a demo or start a Pilot. Bring the enabled bit and the running bit from one line.